Waste Management Symposia 2013
 
 

 

Session 060 - D&D of Nuclear Power Plants

 

 

Chair(s):

Jas Devgun, Sargent & Lundy, LLC
Bernard Poncet, EDF-CIDEN

Primary Organizer:

Jas Devgun, Sargent & Lundy, LLC

Additional Org(s):

Bernard Poncet, EDF-CIDEN
Anja Graf, WAK GmbH  

 

 

Order

Paper Title

1

Testing and Commissioning of a Multifunctional Tool for the Dismantling of the Activated Internals of the KNK Reactor Shaft - 13524
Stefan Rothschmitt, WAK GmbH (Germany); Anja Graf, WAK GmbH (Germany); Stefan Bauer, Siempelkamp Nukleartechnik GmbH (Germany); Stefan Klute, Siempelkamp Nukleartechnik GmbH (Germany); Eiko Koselowski, Siempelkamp Nukleartechnik GmbH (Germany); Klaus Hendrich, IBH Ingenieurbüro Hendrich (Germany)

2

Concepts and Tests for the Remote-Controlled Dismantling of the Biological Shield and Formwork of the KNK Reactor - 13425
Stefan Rothschmitt, WAK GmbH (Germany); Sylvia Neff, WAK GmbH (Germany); Anja Graf, WAK GmbH (Germany); Holger Petrick, WAK GmbH (Germany); Stefan Klute, Siempelkamp Nukleartechnik GmbH (Germany); Dieter Stanke, Siempelkamp NIS Ingenieurgesellschaft mbH (Germany)

3

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445
Joseph Boucau, Westinghouse Electric Company (Belgium); C. Mirabella, Westinghouse Electric Company (France); Lennart Nilsson, Westinghouse Electric Company (Sweden); Paul Kreitman, Westinghouse Electric Company (USA); Estelle Obert, EDF – DPI – CIDEN (France)

4

Decommissioning of the Dragon High Temperature Reactor (HTR) Located at the Former United Kingdom Atomic Energy Authority (UKAEA) Research Site at Winfrith - 13180
Anthony Smith, Research Sites Restoration Ltd (United Kingdom)

5

Reactor Vessel and Reactor Vessels Internals Segmentation at Zion Nuclear Power Station, IL - 13230
Conrad Cooke, Siempelkamp Nuclear Technology (USA); Holger Spann, Siemplekamp Nuclear Services, Inc. (USA)

6

Progress in Decommissioning the Humboldt Bay Power Plant - 13604
Kerry Rod, Pacific Gas & Electric (USA); John Kristofzski, CH2M HILL, Inc. (USA); Steven Shelanskey, Anata Management Solutions (USA)

7

Factors Impacting Decommissioning Costs - 13576
Karen Kim, Electric Power Research Institute (USA); Richard McGrath, Electric Power Research Institute (USA)

8

Unique Chernobyl Cranes for Deconstruction Activities in the New Safe Confinement - 13542
Rob Owen, PaR Systems, Inc. (USA); Narayanan (Vijay) Parameswaran, Bechtel Systems and Infrastructure, Inc. (USA); Igor Chornyy, Chernobyl NPP-SIP-PMU (Ukraine); Dan Kedrowski, PaR Systems, Inc. (USA); Eric Schmieman, Battelle Memorial Institute (USA)

   
   

Copyright © 2013 WM Symposia. All Rights Reserved.

 

Produced by X-CD Technologies Inc.