Select Session       .


Technical Program
 
  .
Monday 2/25/02
1:30 PM      SESSION  6A     Exhibit Hall A,B,C
TRU

1   Absorbing WIPP Brines: A TRU Waste Disposal Strategy
D. R. Yeamans, LANL; R. S. Wright, Aquadox (USA)
2   TRU Management in the Site Treatment Plan at the INEEL
M. Davis, BBWI; D. Rasch, USDOE-ID (USA)
3   Solidification Tests Conducted on Transuranic Mixed Oil Waste (TRUM) at the Rocky Flats Environmental Technology Site (RFETS)
W. G. Brunkow, The Chamberlain Group, Ltd.; D. Campbell, Nochar Inc.; R. Giemer, C. Gilbreath, Kaiser-Hill RFETS; M. Rivera, Los Alamos Technical Associates (USA)
4   Handling and Segregating System for 55-Gallon Drums Project-Current Progress on Testing and Integration at the Western Environmental Technology Office
D. M. Battleson, S. E. Johnson, J. L. Montgomery, S. B. Bryson, MSE Technology Applications, Inc.; M. C. Stacey, C.M. Frazee, Bechtel BWXT Idaho, LLC (USA)
5   Preparations and Planning for EPA Recertification of the Waste Isolation Pilot Plant
S. Casey, WTS; R. Patterson, U.S. DOE – CFO; P. Shoemaker, SNL – Carlsbad Operations (USA)
6   Radiological Risk Assessment for the Remote-Handled Transuranic Waste Storage Options at Agronne National Laboratory-East
J.-J. Cheng, C. Yu, ANL; W. A. Williams, W. Murphie, USDOE (USA)

Home