Waste Management Symposia 2010
 

 

Session 30 - Status and Plans at the US DOE Waste Isolation Pilot Plant (WIPP)

 

 

Chair(s):

Roger Nelson, US DOE (USA)
Nancy Zacha, Radwaste Solutions Magazine (USA)

 

 

Order

Paper Title

1 

WIPP Status and Plans - 2010 - 10363
Roger Nelson, US DOE (USA); Dave Moody, US DOE (USA)  

2 

The Role of the Technical Assistance Contractor at the Waste Isolation Pilot Plant - 10596
Randal Steger, Navarro Research and Engineering, Inc. (USA); Dick Blauvelt, Navarro Research and Engineering, Inc. (USA); Wayne Ledford, Navarro Research and Engineering, Inc. (USA); Steven Calvert, Navarro Research and Engineering, Inc. (USA)  

3 

Mobile Loading Transuranic Waste at Small Quantity Sites in the Department of Energy Complex - 10523
Mitch Carter, Los Alamos National Laboratory (USA); Jerri McTaggart, Los Alamos National Laboratory (USA); Bryan Howard, Los Alamos National Laboratory (USA); Wade Weyerman, Los Alamos National Laboratory (USA)  

4 

Transportation Incidents and Lessons Learned From Nearly 20 Million Miles of WIPP Shipments - 10053
Roger Nelson, US DOE (USA); William Mackie, US DOE (USA)  

5 

Update on Waste Isolation Pilot Plant Recertification - 2009 - 10221
Steve Kouba, URS Corporation (USA); Russell Patterson, US DOE (USA); Michael Gross, MG Enterprises (USA); Art Chavez, URS Corporation (USA)  

6 

Planned EPA Regulatory Changes at the WIPP: 2010 and Beyond - 10595
Steve Kouba, URS Corporation (USA); Russell Patterson, US DOE (USA); Michael Gross, MG Enterprises (USA)  

7 

WIPP Hazardous Waste Facility Permit Renewal Application Update - 10206
William Most, URS Corporation (USA); Robert Kehrman, URS Corporation (USA)  

8 

WIPP Hazardous Waste Facility Permit 2010 Update – Ten Years Old and Counting - 10210
Robert Kehrman, URS Corporation (USA); Dave Streng, URS Corporation (USA); Rick Chavez, URS Corporation (USA); William Most, URS Corporation (USA)  



 


    Copyright 2010 WM Symposia
 

 

Produced by X-CD Technologies Inc.